Feasibility study
Conceptual design
Basic design
Detailed design
Installation
Commissioning & handover
Contact me for more information
Kjeld Lemke
Director, Pharma Section
Phone: +45 2679 5755

Project description

This is an ongoing project at Lundbeck A/S Lumsås where the existing process plant in synthesis factory F2 is to be upgraded with a new synthesis unit consisting of a reactor source, a reactor and a condenser. In connection with the upgrade the new synthesis unit is to be supplied with panels for managing valves and general control of the sources, the reactor and the condenser.

The process

Lundbeck is responsible for the overall project management, HAZOP, mechanical installation of components as well as for qualification of the new process equipment. Process Engineering reports to the project manager from Lundbeck and provides consulting services on process and electricity/SRO in relation to the process plant, the electricity supply and CE marking. In addition, we will prepare an ATEX report about the entire installation.

In order to streamline the process, and in partnership with Lundbeck, we focus on how the tests performed during qualification can be integrated in the CE marking.

Udvidelse af synteseproduktion i eksisterende syntesefabrik F2

Service and scope of the project

Our service and the scope of the project include:

  • Design of supply current
  • SRO design
  • Tender material and requirements specification
  • Installation tender
  • Installation and contruction management
  • Start-up engineer(s)
  • ATEX report of the entire installation
  • Documentation and CE marking